Andrea Cruz | Sarah Espinosa
LIGHT-RAIL
CONSTITUCIÓN Y ESCOBEDO
TLAJOMULCO
_______________________________________________________________________
1- Map of the light rail line
2- Existing Conditions Site Plan
3- Site Area Collage
4- Existing Conditions TOD Scorecard
5- Needs and Recommendations for
a) Land Use
b) Open Space
c) Transportation
d) Housing
6- Demographics
7- Values and Objectives Diagrams
8- General Proposal Site Plan
9- Existing Conditions and Proposed Street Section
10- Open Space Diagram
11- Sustainability Strategies Section
12- Light Rail Stop Collage Perspective
13- Projected TOD Scorecard with project implementation
14- Annex Materials
ANALYSIS OF EXISTING CONDITIONS
MAP OF THE LIGHT RAIL LINE
______________________________________________________________________
EXISTING CONDITIONS SITE PLAN
_______________________________________________________________________
SITE AREA COLLAGE
_______________________________________________________________________
LAND USE
LAND USE RECOMMENDATIONS
-Improvement of the conneciton fo the street layouts to join the different districts.
-Create pedestrian streets in order to make a safer, enjoyable and better relationship between the citizens.This also could help the local commerces to be more accesible.
-It is important to create atention centres.
_______________________________________________________________________
PARKS, RECREATION AND OPEN SPACE
PARKS, RECREATION AND OPEN SPACE RECOMMENDATIONS
- Have more green spaces connected
-Use the lost spaces strategically as parks
- Increase the making of parks that generate sense of appropiation and belonging
- Plant trees and vegetation that help reduce the train and traffic noise
- Increase meeting points for kids and teenager and foment recreatinal events
_______________________________________________________________________
TRANSPORTATION
PUBLIC TRANSPORT RECOMMENDATIONS
- Install safe crossing points and signals
- Improve bike path connectivity and install "Mibici" stops
- Increase the number of internal and external bus routes
- Improve the quality of the sidewalks and their connection, to have a better pedestrian network
- Add vegetation in peripheries and ridges to reduce heat and traffic density
- Improve bus stops to be safe waiting spaces
- Have a place for parking that protects the pedestrian from the tracking
_______________________________________________________________________
DEMOGRAPHICS AND HOUSING
DEMOGRAPHICS AND HOUSING RECOMMENDATIONS
- Install better street lighting to make the streets feel safer
- Place shops and parks in points that are considered or that "feel" unsafe
- Improve water and sewage system
- Help improve the house quality (materials) as lot of them suffer from leaks and cracks
- Install better street lighting to make the streets feel safer
- Place shops and parks in points that are considered or that "feel" unsafe
- Improve water and sewage system
- Help improve the house quality (materials) as lot of them suffer from leaks and cracks
-Improve accesibility in streets, public spaces, etc. for disabled people.
_______________________________________________________________________
EXISTING CONDITIONS SCORECARD
TOTAL POINTS: 44
_______________________________________________________________________
STREET SECTION
ACTUAL
IMPORVEMENTS IDEAS
_______________________________________________________________________
VALUE AND OBJECTIVE DIAGRAMS
_______________________________________________________________________
PROPOSAL SITE PLAN
_______________________________________________________________________
PROPOPSAL SITE PLAN
_______________________________________________________________________
OPEN SPACE DIAGRAM
SUSTAINABILITY DIRAGRAM
STREET SECTION
CULTURAL CORRIDOR
TRAIN STATION
PUBLIC ENGAGEMENT
PROJECTED TOD SCORECARD WITH PROJECT IMPLEMENTATION
TOTAL = 79
_______________________________________________________________________
ANNEX MATERIALS
https://www.behance.net/gallery/104296609/PHASE-I-_-Andrea-Cruz